ZONE D PROJECT OF NHA BE PETROLEUM TERMINAL

Owner: PETROLIMEX SAIGON

1. Fabrication and Construction of steel tank A13, A14, A18, A22 and auxiliary categories

Construction time under contract: 200 days

Date of contract: July 13, 2009

Total capacity: 50,000m3

2. Construction of 7 tank bases + tank fabrication D5, D6, D7, D8, D9, D10, D11 Zone D of Nha Be Petroleum Terminal

Pipelines technology construction, pumping station and fire fighting system in Zone D of Nha Be Petroleum Terminal

Total capacity: 82,000m3

Zone D Construction - Nha Be Petroleum Terminal

Pipelines technology in Zone D - Nha Be Petroleum Terminal