ZONE D PROJECT OF NHA BE PETROLEUM TERMINAL
Owner: PETROLIMEX SAIGON
1. Fabrication and Construction of steel tank A13, A14, A18, A22 and auxiliary categories
Construction time under contract: 200 days
Date of contract: July 13, 2009
Total capacity: 50,000m3
2. Construction of 7 tank bases + tank fabrication D5, D6, D7, D8, D9, D10, D11 Zone D of Nha Be Petroleum Terminal
Pipelines technology construction, pumping station and fire fighting system in Zone D of Nha Be Petroleum Terminal
Total capacity: 82,000m3
Zone D Construction - Nha Be Petroleum Terminal
Pipelines technology in Zone D - Nha Be Petroleum Terminal